Case studies

View next case study

k

View next case study

k

Power Station Load Sharing & Synchronising

Synchronizing Controls for 10 no’s of Generators (800 KW to 1600 KW – 15MW total).  This system was set up as a power station and has been running problem free for over 2 years.